Skip to main content Skip to page footer

Projects of Seebacher

An excerpt of our most beautiful reference objects from recent years.

Now the Frauenried pilgrimage church is shining again!

The lighting design by CE Späth together with the lighting control system from Seebacher has done some real restoration work here. Originally, the somewhat grayed church frescoes and stucco work were almost in need of renovation. The result not only delights church visitors, ...

Learn more...

Evangelical Community Centre Miesbach

In September 2022, the Protestant parish in Miesbach opened its new parish hall with a glass foyer. Built alongside the Apostelkirche church in the heart of Miesbach, it is a lively place where people come together every day.

Learn more...

Kultur-Schloss in Theuern

The monument-protected Kultur-Schloss/Mining and Industrial Museum Theuern is being renovated and modernised in a total of three construction phases. The second construction phase began in 2022, a two-year modernisation phase of the historic Hammerherrenschloss in the Oberpfalz region. This was finalised in October 2023.

Learn more...

Salzburg State Theatre

The renovation of the 130-year-old building was completed on time and on budget. From May - October 2022, central building components of the Salzburg Landestheater were renovated - from the balcony podium to the seating, the stage technology and the hall lighting.

Learn more...

Gewandhaus zu Leipzig

The 2nd construction phase for modernisation began in May 2020: the Great Hall of the famous concert hall was converted to LED lighting. The rebuilding of the entire stage lighting in the Great Concert Hall was realised. The luminaires used since the opening of the house were replaced by dimmable LED luminaires.

Learn more...

Grand Hotel des Bains Kempinski St. Moritz with a new lighting design.

The existing façade lighting made of halogen spotlights was in urgent need of energy refurbishment due to its enormous energy consumption. Light Fashion - Switzerland developed new RGBW LED façade luminaires with RF modules for this purpose.

Learn more...

Sächsisches Staatsbad Bad Elster

The joint project of the Sächsische Staatsbäder GmbH and the Chursächsische Veranstaltungsgesellschaft will be initiated on Saturday, 9 October 2021 at the start of twilight and the shining of the new World of Lights in the Royal Gardens and will then be accessible free of charge every day, 365 days a year.

Learn more...

Iodine-sulphur bath in Bad Wiessee

The Wiessee medicinal springs "Adrianus" and "Königin Wilhe­lmina" are the strongest iodine and sulphur springs in Germany and have been used for therapeutic purposes since their discovery in 1910. In order to be able to continue to benefit from this healing water with all senses in the future, the springs were renovated and given a modern look with the new building of the iodine-sulphur bath.

Learn more...

 

Sonnenalp Resort

The hotel has been family-run since 1919 - and the focal points that make the hotel an incomparable address in the Alpine region are crystallising more and more: Wellness, culinary delights, golf and winter sports, combined with a wide range of amenities for families. For several years now, the Sonnenalp has been completely renovated and now shines in new glory for its 100th birthday in 2019...

Learn more...

 

Kulturpalast Dresden

After four years of construction, the time has come today: the listed Kulturpalast with a concert hall for 1,800 seats opens its doors. The new concert hall, home to the Dresden Philharmonic, forms the heart of the building, which was erected in 1969.

Learn more...

Parish church St. Josef in Holzkirchen

The church room is a so-called "daylight church". The lighting design should therefore include and support the change in daylight. Any additional amount and dynamics of light therefore had to be positioned with much sensitivity.

Learn more...

Hotel Adlon in Berlin

The lobby of the Hotel Adlon shines in new splendour: In only three months the entire lobby was completely renovated and reopened at the end of 2016. From the carpet to the lighting and its control to the furniture, the area was redesigned. The renovation took place without interrupting operations and was carried out with a total investment of six million euros.

Learn more...

Multifunctional room eMotion Base

The Flinthöhe in Bad Tölz lights up: 1,500 LEDs and 16 million colours ensure that the eMotion Base, which opened in January 2017, shines in every conceivable colour. The multifunctional room for movement training is enclosed in a building shell that can be illuminated - a kind of Allianz Arena in mini format...

Learn more...

Sistine Chapel Rome

The aim of the EU-funded project was to drastically reduce power consumption, achieve high colour fidelity and uniform illumination and protect the paintings. This is achieved with OSRAM's specially developed luminaires for this project, which are controlled by us using LED dimmers and DALI protocols.

Learn more...

Hotel Das Tegernsee

Between heaven and earth is the hotel "Das Tegernsee". As a guest you can retreat there and enjoy. The room lighting is operated with our specially developed endless rotary potentiometer and follows a reduced concept so that every guest knows his way around intuitively.

Learn more...

Complete reference list

Our references clearly arranged in a list

Are you looking for projects near you? Or just want to see where Seebacher is represented everywhere? Then our reference list will help you. It can be filtered by region and category.

Overview

Questions about the project?

Phone: +49 8021 50434-0
eMail: info@seebacher.de

To the contact form

Subscribe to our newsletter

Product news, technical tips and industry news

Registration